Case studies of projects undertaken by the ProCure22 PSCPs

Intra-operative 3T MRI and Hybrid Cardiac Theatre, Leeds General Infirmary, Leeds Teaching Hospitals NHS Trust Monkton Hall Primary Care Centre, South Tyneside NHS Foundation Trust Redwoods Centre, Shrewsbury, South Staffordshire and Shropshire Healthcare NHS Foundation Trust Atherleigh Park, North West Boroughs Healthcare NHS Foundation Trust Burnley General Hospital – Integrated Urgent Care Centre, East Lancashire Hospital NHS Trust Royal Edinburgh Hospital – Phase 1, NHS Lothian Pathology Services, Gateshead Health NHS Foundation Trust A&E and Maternity Services, Sidcup Hospital, Oxleas NHS Foundation Trust Mitford Unit, Morpeth, Northumberland, Tyne and Wear NHS Foundation Trust Monklands Hospital Theatres/ITU Refurbishment, NHS Lanarkshire Intensive Psychiatric Care Unit, Stratheden Hospital, NHS Fife Lister Hospital – multiple projects, East & North Hertfordshire NHS Trust The Harbour, Blackpool, Lancashire Care NHS Foundation Trust Bridgwater Community Hospital, Somerset Partnership NHS Foundation Trust Multiple major and minor Capital Projects, South West Yorkshire Partnership NHS Foundation Trust Proton Beam Therapy, The Christie NHS Foundation Trust East Riding Community Hospital, Humber NHS Foundation Trust Inpatient Ward Block, Ulster Hospital, Belfast, South Eastern Health & Social Trust

Lister Hospital – multiple projects, East & North Hertfordshire NHS Trust

HP was appointed to deliver a package of works for Lister Hospital to transform facilities for the Trust, including: New day surgery theatres, 4 endoscopy theatres with decontamination suite (5,230m2) and reconfiguration works to the Elective Admissions Unit (EAU). New build and refurbishment of Emergency Care, Orthopaedic and Fracture Clinics, CT scanner suite (4,500m2). New ward block with acute Admissions Unit, Coronary Care Unit and High Dependency Unit (4,548m2).

read more

Inpatient Ward Block, Ulster Hospital, Belfast, South Eastern Health & Social Trust

The new 30,000m2 Inpatient Ward Block (IWB) is the first phase of the extensive £261m Phase B Redevelopment Programme at the Ulster Hospital. The seven storey ward block provides 12 inpatient wards comprising 288 single rooms with en-suite bathrooms. The accommodation provides a new Day Surgery, (four operating theatres, one of which is ultra-clean), a three procedure room Endoscopy department, Angiography department, Cardiac Investigation Unit, Robotic Pharmacy department and a Public Café.

read more

Mitford Unit, Morpeth, Northumberland, Tyne and Wear NHS Foundation Trust

Mitford is located on the existing Northgate Hospital site in Morpeth providing 24 hour support and treatment for adults with complex and severe autistic spectrum disorders. It is the first building in the UK specifically designed for this patient group and is a pioneering project, requiring sector-leading, client driven design standards. The building includes residential accommodation for up to 15 adults, in single and shared flats within the four ‘fingers’ of accommodation.

read more

Redwoods Centre, Shrewsbury, South Staffordshire and Shropshire Healthcare NHS Foundation Trust

The Redwoods Centre, a modern in-patient mental healthcare village, represents a revolutionary change for patients and the communities of Shropshire, Telford and Wrekin. The design moves away from the institutional elements of the former Shelton Hospital, Shrewsbury, by providing a domestic feel to the living accommodation to provide the highest standards of care in a comfortable environment. Procured through ProCure21 and opened in 2012, the Trust required BAM to design and build a modern mental health facility to meet 21st century requirements of mental health provision. The new facility allowed staff the opportunity to rethink the way they deliver mental health services.

read more

A&E and Maternity Services, Sidcup Hospital, Oxleas NHS Foundation Trust

Over recent decades’ lack of investment and uncertainly around sustainable clinical services had led to the closure of both the medically led A&E and Maternity Services due to safety concerns at Sidcup Hospital site. Oxleas as a Mental Health Trust, recognised the importance of developing the hospital to support integrated services and seamless care for patients. With seven NHS Trusts and private providers renting space on the site it was essential to obtain stakeholder consensus and ensure any solutions provided supported future care needs.

read more

The Harbour, Blackpool, Lancashire Care NHS Foundation Trust

IHP was awarded the major appointment to design and construct a new 154-bed low security mental health inpatient unit, with a gross internal floor area of 12,647m2. Comprising Dementia, Advanced Care, Psychological Intensive Care Units and Adult Functional Wards, the Harbour was designed with extensive input from service users and clinicians and is based on good practice guidance and ‘safety by design’ to ensure the provision of high quality care. The ethos of the unit is to provide therapeutic care which is empowering, person centred, needs led, and focuses on promoting recovery and independence.

read more

Proton Beam Therapy, The Christie NHS Foundation Trust

The Christie is Europe’s largest single site cancer centre, and serves a population of 3.2million. The national proton beam therapy (PBT) service is being developed with two centres under construction, one at The Christie NHS Foundation Trust and the other at University College London Hospitals NHS Foundation Trust. They are both funded by a £250 million government investment. Interserve was appointed through P21+ Framework to design and deliver the Manchester PBT centre through a rigorous public procurement process.

read more

Intensive Psychiatric Care Unit, Stratheden Hospital, NHS Fife

A previously outdated and unsatisfactory Victorian facility, has been replaced with an eight bed care unit, providing a modern therapeutic environment, aimed at prevention of relapse and promotion of recovery. The new unit offers a considerably more homely environment, providing significant clinical benefits which support recovery and shorten the length of stay. Individuals who are cared for in the new facility have access to an art and music room, a group therapy room, gym and a relaxation area, which creates a better environment and allows staff to deliver the therapies which aid patients in their rehabilitation.

read more

Burnley General Hospital – Integrated Urgent Care Centre, East Lancashire Hospital NHS Trust

In January 2014, East Lancashire Hospital NHS Trust opened the doors of its new Integrated Urgent Care Unit at Burnley General Hospital (BGH). One of the first new units that encompassed the Department of Health’s drive to relieve pressure on accident and emergency departments through the creation of facilities to provide a seamless treatment pathway for minor injuries and out of hours GP care. The key element of the design process was to ensure that the patient experience was safe, efficient, providing a high levels of privacy and dignity whilst maintaining excellent standards of observation.

read more

Monkton Hall Primary Care Centre, South Tyneside NHS Foundation Trust

Procured through the ProCure21 Framework, BAM provided a new Mental Health Respite Care Centre by refurbishment and extension of the existing 1960s facility and car park in response to the planning constraints for the site. The aim was to provide a facility with a modern working environment including offices, care for patients with severe learning difficulties, sensory rooms and independent living quarters. While providing treatment services the 12 bedrooms are also designed to be ‘homely’ to ensure that patients are at ease with their surroundings. The facility has ancillary accommodation providing lounge, dining, exercise and office accommodation for patients. The respite facility ‘Monkton Hall’, a grade two listed building, was refurbished to provide office accommodation required from the previous use of the respite centre.

read more

Royal Edinburgh Hospital – Phase 1, NHS Lothian

East Lothian NHS Trust appointed Galliford Try (Morrison Construction) and NORR Architects in 2012 to help the Trust develop a Masterplan for rationalisation of Mental Health services in Edinburgh over the following seven years. GT managed the complex approval and financing required for the programme, the first in Scotland to achieve financial close under the Scottish Futures Trust Design Build Finance and Maintain model. The scheme involved the redevelopment of the Royal Edinburgh Hospital site in two` main phases. Phase 1 – the re-provision of inpatient services into a new state of the art 185-bed facility, then Phase 2, the refurb remodelling of the existing 200-year-old Grade B listed building for out-patient facilities, rehab and support services.

read more

Bridgwater Community Hospital, Somerset Partnership NHS Foundation Trust

As part of proposals to replace the Trust’s ageing 200 year old hospital, IHP delivered a new 5,003m2 community facility with inpatient beds, midwifery-led maternity unit, minor injuries unit, diagnostic/radiological, outpatient one stop shop, day treatment, therapy and rehabilitation services. IHP established a structured approach to working with the hospital’s clinicians and managerial staff which focused open user-engagement. Early involvement also enabled IHP to increase the scope of work to include an endoscopy unit without impacting on the overall cost or programme.

read more

East Riding Community Hospital, Humber NHS Foundation Trust

The light and spacious East Riding Community Hospital designed and delivered through the P21 Framework brought three ageing services together into a longed-for new community facility fit for the 21st Century. The new hospital was designed taking into consideration its surroundings and used sustainable and natural materials to provide a therapeutic environment for all patients and visitors to the hospital.

read more

Monklands Hospital Theatres/ITU Refurbishment, NHS Lanarkshire

This complex project involved construction of a new Intensive Care Unit together with a twelve phase replacement and upgrade of the Surgical Department to provide seven new operating suites, including two Ultra Clean Theatres, relative’s area, reception and recovery areas. Both facilities are being constructed to current SHTM and SHBN design standards.

read more

Atherleigh Park, North West Boroughs Healthcare NHS Foundation Trust

Atherleigh Park represents a major transformation in the care pathway and overall estate rationalisation for North West Boroughs Healthcare (formerly 5 Boroughs Partnership) located in the heart of the Leigh community it serves. This ambitious flagship design was led from the outset by service users and staff, who have worked tirelessly with the Kier team to achieve what is already widely recognised as an exemplar for the future of mental health design.

read more

Intra-operative 3T MRI and Hybrid Cardiac Theatre, Leeds General Infirmary, Leeds Teaching Hospitals NHS Trust

The Intra-operative 3T MRI and Hybrid Cardiac Theatre project is part new build, part refurbishment at the Leeds Children’s Hospital (Clarendon Wing) at Leeds General Infirmary. The Client’s scope of works requires the extension of the existing facilities adjacent the 4th floor. The new floor space and housing for the new MRI and Theatre facilities will be contained within a dynamic and iconic design to provide the D Floor extension 16m above ground level.

read more

Pathology Services, Gateshead Health NHS Foundation Trust

The case study looks at the project that South of Tyne Pathology undertook with Galliford Try to bring general pathology services from three trusts into a single automated facility after the recommendations were first made by Lord Carter in 2009. The brief was developed through a rapid programme of collaborative dialogue. A series of workshops with pathology staff from all three Trusts were held, with a senior member of staff taking single point of responsibility for decision making, this ensured that consistent direction and programme was maintained.

read more

P22 Projects

Schemes and projects

VAT Recovery

Schemes that are delivered through the P22 framework are offered a free of charge VAT recovery service. Since April 2015, to the end of quarter 3 in financial year 2017-18, approximately £39m in VAT has been recovered.

ProCure21+

ProCure21+ website: www.procure21plus.nhs.uk

Contact

ProCure22
Department of Health
Quarry House
Leeds LS2 7UE

P22@dh.gsi.gov.uk
0113 254 6133

Full contact list