8 Oct 2018 | 2018, BAM, Case study
The Redwoods Centre, a modern in-patient mental healthcare village, represents a revolutionary change for patients and the communities of Shropshire, Telford and Wrekin. The design moves away from the institutional elements of the former Shelton Hospital, Shrewsbury,...
8 Oct 2018 | 2018, BAM, Case study
The Intra-operative 3T MRI and Hybrid Cardiac Theatre project is part new build, part refurbishment at the Leeds Children’s Hospital (Clarendon Wing) at Leeds General Infirmary. The Client’s scope of works requires the extension of the existing facilities adjacent the...
8 Oct 2018 | 2018, BAM, Case study
Procured through the ProCure21 Framework, BAM provided a new Mental Health Respite Care Centre by refurbishment and extension of the existing 1960s facility and car park in response to the planning constraints for the site. The aim was to provide a facility with a...
3 Nov 2017 | 2017, BAM, Case study
The Redwoods Centre, a modern in-patient mental healthcare village, represents a revolutionary change for patients and the communities of Shropshire, Telford and Wrekin. The design moves away from the institutional elements of the former Shelton Hospital, Shrewsbury,...
2 Nov 2017 | 2017, BAM, Case study
Procured through the ProCure21 Framework, BAM provided a new Mental Health Respite Care Centre by refurbishment and extension of the existing 1960s facility and car park in response to the planning constraints for the site. The aim was to provide a facility with a...
2 Nov 2017 | 2017, BAM, Case study
The Intra-operative 3T MRI and Hybrid Cardiac Theatre project is part new build, part refurbishment at the Leeds Children’s Hospital (Clarendon Wing) at Leeds General Infirmary. The Client’s scope of works requires the extension of the existing facilities adjacent the...