bam

BAM is delighted to be part of the ProCure22 Framework. We intend to build on the excellent quality and delivery we achieved during our work on ProCure 21.

Our culture and integrated partnering approach is a strong fit for the values and needs of the framework. Clients who work with us praise us for our intelligent, collaborative and engaging approach and the way we can support their whole estate management strategy.

Our healthcare work is led by an expert national team, supported by six strong, regionally-based delivery teams to drive local value. In addition, we have assembled a team of expert partners and a supply chain who share our values and commitment to delivery.

As leaders in digital design, construction and FM we take a holistic approach to delivering healthcare facilities that will work operate efficiently and be easy to manage throughout their entire lifecycle

There are no more important buildings than those where lives are saved. They need to be built with a care and sensitivity towards the professionals who work there and the people they treat. So we listen attentively to healthcare professionals and constantly look for ways to optimise the healthcare outcomes in the new facilities we create.

Along with the other companies in Royal BAM Group, we participate in the Group’s forum for international collaboration in healthcare, continually learning from and sharing expertise and experience gained around the world on new technologies, techniques and products.

Registered projects

Case studies and news

Redwoods Centre, Shrewsbury, South Staffordshire and Shropshire Healthcare NHS Foundation Trust

The Redwoods Centre, a modern in-patient mental healthcare village, represents a revolutionary change for patients and the communities of Shropshire, Telford and Wrekin. The design moves away from the institutional elements of the former Shelton Hospital, Shrewsbury, by providing a domestic feel to the living accommodation to provide the highest standards of care in a comfortable environment. Procured through ProCure21 and opened in 2012, the Trust required BAM to design and build a modern mental health facility to meet 21st century requirements of mental health provision. The new facility allowed staff the opportunity to rethink the way they deliver mental health services.

read more

Monkton Hall Primary Care Centre, South Tyneside NHS Foundation Trust

Procured through the ProCure21 Framework, BAM provided a new Mental Health Respite Care Centre by refurbishment and extension of the existing 1960s facility and car park in response to the planning constraints for the site. The aim was to provide a facility with a modern working environment including offices, care for patients with severe learning difficulties, sensory rooms and independent living quarters. While providing treatment services the 12 bedrooms are also designed to be ‘homely’ to ensure that patients are at ease with their surroundings. The facility has ancillary accommodation providing lounge, dining, exercise and office accommodation for patients. The respite facility ‘Monkton Hall’, a grade two listed building, was refurbished to provide office accommodation required from the previous use of the respite centre.

read more

Intra-operative 3T MRI and Hybrid Cardiac Theatre, Leeds General Infirmary, Leeds Teaching Hospitals NHS Trust

The Intra-operative 3T MRI and Hybrid Cardiac Theatre project is part new build, part refurbishment at the Leeds Children’s Hospital (Clarendon Wing) at Leeds General Infirmary. The Client’s scope of works requires the extension of the existing facilities adjacent the 4th floor. The new floor space and housing for the new MRI and Theatre facilities will be contained within a dynamic and iconic design to provide the D Floor extension 16m above ground level.

read more

Contacts

Gordon Stirling – Framework Manager
Email: gstirling@bam.co.uk mobile 07740 027025

Expressions of interest (EOI)

Please send all expressions of interest to p22eoi@bam.co.uk

Further information

Find out more about our work at www.bam.co.uk/how-we-do-it/-in-sectors/sectors/health

P22 Projects

Schemes and projects

VAT Recovery

Schemes that are delivered through the P22 framework are offered a free of charge VAT recovery service. Since April 2015, to the end of quarter 3 in financial year 2017-18, approximately £39m in VAT has been recovered.

ProCure21+

ProCure21+ website: procure21plus.nhs.uk

Contact

ProCure22
NHS Estates and Facilities Team
NHS England and NHS Improvement
Quarry House, Leeds LS2 7UE

nhsi.procureconstruction@nhs.net

Full contact list